| 15.2.1 | PRIVATE SECTOR PARTICIPATION |
| | |
| | The State Government shall encoursge Private Sector Participation in generation and distribution of power. The distribution of power in industrial areas and major cities of the State like Ranchi, Jamshedpur and Dhanbad are being contemplated for privatisation. The private sector power plant would be able to sell power to the State Electricity Board or to supply directly to bulk consumers and units in their designated load areas. It shall also be able to sell power to any grid or export power outside the state with the concurrence of the State Electricity Board. Thus, it is intended to provide wheeling and banking of power through the transmission and distribution system of the State Electricity Board. |
| | |
| 15.2.2 | CAPTIVE POWER GENERATION |
| | |
| | The Government would encourage private sector in setting up of Captive Power Generation Plants of any capacity to meet the existing as well future demand for power of industrial units. For setting up such power generation unit, no permission from SEB shall be required. The surplus power generated by such plant could also be purchased by the State Electricity Board on mutually agreed terms. The State Electricity Board shall allow wheeling and banking to such power plants. Large industrial unit/ consortium of industrial enterprises in growth centres/ industrial areas shall be allowed to set up power generating units as well as to take over distribution of power in such industrial complexes. Such captive power generation and purchase shall be provided exemption from electricity duty for a period of ten years from the date of commercial production. |
| | |
| 15.2.3 | Entrepreneurs will be permitted to use power generating sets. The unit desirous of using power generating sets shall be required only to inform the State Electricity Board of their intention in this regard. |
| | |
| 15.2.4 | PRIORITY TO INDUSTRIAL CONNECTION |
| | |
| | To ensure timely starting of industrial project, the State Electricity Board shall provide LT and HT industrial connection to such units within a period of 30 and 60 days respectively. |
| | |
| 15.2.5 | All incentives given to new industrial units shall also be available to the new power projects. |
| | |
| 15.2.6 | The Govt. would encourage two-tier tariff system for "peak and off peak" hour separately. To avail this facility T.O.D. meter shall have to be installed by the industrial units at their own cost. |
| | |
| 15.2.7 | The Government shall endeavor to provide exclusive dedicated feeder to industrial areas to ensure quality, uniinterrupted supply of power to the industrial units located within. |
| | |
| 15.2.8 | Concept of maximum connected load will be changed to the concept of maximum Demand Load. Units desirous of availing this facility shall have to install electronic meters at their own cost. |
| | |
| 15.2.9 | Industrial units applying for a load of 100 H.P/ 100 KVA or less shall be given connection under LTIS. |
| | |
| 15.2.10 | Industrial units applying for more than 100 H.P/ 100 KVA shall be given connection under HTIS. |
| | |
| 15.2.11 | Exemption from payment of Minimum Guarantee Charge for new Industrial Units having connected load up to 500 KVA or equivalent H.P, as per billing norms. |
| | |
| 15.2.12 | For the period the Board is unable to supply power or the consumers unable to take supply due to certain reasons beyond their control such as natural calamity, accidental fire, labour unrest, major industrial accident etc., proportionate relief will be given in fixed charges and Minimum Guarantee charges. |
| | |
| 15.2.13 | SEB will accept NSC/ Fixed Deposits against security money. |
| | |
| 15.2.14 | Amount of Security Deposit/ Advance shall be fixed on the basis, on which Minimum Guarantee Charge is calculated and not on the basis of average consumption. |
| | |
| 15.2.15 | The rate of delayed payment surcharge shall be recoverable from the defaulting units at 1/2% (half) interest per week basis and not on monthly basis. |
| | |
| 15.2.16 | Notice period for disconnection or reduction of power load by HT consumers shall be six months. |
| | |
| 15.2.17 | For H.T. consumers, if the consumption exceeds the contracted demand up to 15% in a particular month, minimum guarantee charges, fixed charges, etc. shall be charged extra for that particular month only. On the other hand if consumption exceeds the contracted demand beyond 15%, minimum guarantee charges, fixed charges etc. shall be charged extra for a period of only 6 months instead of present 12 months. |